Building and housing codes
Key points
- On November 20, 2026, DOER filed proposed final Stretch and Specialized Code regulations with the legislature; the department says the changes are not meant to increase stringency.
- The Board of Fire Prevention Regulations voted October 15 to begin promulgation of fire-code amendments; the proposed text is not yet in effect.
- As of the latest official DOER count, 62 municipalities have adopted the Specialized Energy Code and 240 have adopted the Stretch Code, not counting those that also adopted the Specialized Code.
What changed this week
On November 20, DOER filed proposed final Stretch and Specialized Code regulations with the legislature; the department says the changes are not meant to increase stringency. The Board of Fire Prevention Regulations voted October 15 to begin promulgation of fire-code amendments; the proposed text is not yet in effect. As of the latest official DOER count, 62 municipalities have adopted the Specialized Energy Code and 240 have adopted the Stretch Code, not counting those that also adopted the Specialized Code. As of Nov 26, 2026, 6:46 a.m. ET. Figures below keep their own source and as-of date.
Part of Law & Codes. See also Massachusetts real estate law.
Official Massachusetts building, energy, fire, electrical, sanitary, lead, plumbing, access and ADU code updates. Dates are as stated on the source page (adopted, effective, filed, voted, or comment deadline).
Massachusetts
Official Massachusetts building, energy, fire, electrical, sanitary, lead, plumbing, access and ADU code updates. Dates are as stated on the source page (adopted, effective, filed, voted, or comment deadline).
14 items
BBRS 11th Edition Manufactured Buildings Subcommittee Meeting (opens in a new tab)
The Board of Building Regulations and Standards lists this 11th edition subcommittee meeting for Dec 3, 2026 at 9:00am as a remote meeting.
DOER files proposed final Stretch and Specialized Code regulations (opens in a new tab)
On November 20, 2026, DOER filed proposed final regulations for the Stretch and Specialized Code with the House and Senate for review by the Joint Committee on Telecommunications, Utilities and Energy. The department says the updates focus on the District Energy System Order of Conditions process, modify provisions concerning accessory dwelling units, allow EPA-approved wood and wood pellet stoves as backup heat in all-electric homes, and make errata and text clarifications, and that none of these changes are intended to increase the stringency or expand the scope of the Stretch or Specialized Code.
Stretch and Specialized Energy Code adoption by municipality (opens in a new tab)
As of November 18, 2026, 62 municipalities have adopted the Specialized Energy Code since 2023 and 240 have adopted the Stretch Energy Code since 2010, not counting municipalities that also adopted the Specialized Code. 34.05% of the state population lives in a Specialized Code community, 58.63% in a Stretch Code community, and 7.32% in a Base Code community.
New fire-safety requirements approved for the next edition of 527 CMR 1.00 (opens in a new tab)
An October 15, 2026 Governor's office announcement says the Board of Fire Prevention Regulations voted that day to include new requirements in the next edition of the Massachusetts Comprehensive Fire Safety Code, expected early next year. The announcement states that sprinkler systems will be required to undergo annual checks for recalled sprinkler heads, that property owners must notify the local fire department and promptly replace recalled equipment, and that local fire departments will also be able to require additional fire protection measures until recalled equipment has been replaced. It also lists updates on hot work in high winds, permitting and certification, and closer alignment with national standards. These provisions are not in effect until the new edition is promulgated.
Board begins promulgation of proposed amendments to the State Fire Code (opens in a new tab)
The Board of Fire Prevention Regulations voted on October 15, 2026, to begin the promulgation process for proposed amendments to 527 CMR 1.00, the Massachusetts Comprehensive Fire Safety Code. The Board is making the proposed text available in advance of the required public comment period. The proposed text is not final and remains subject to change, and should not be relied upon as an adopted regulation until the promulgation process is complete and the final regulations have been published in the Massachusetts Register and taken effect. The current State Fire Code went into effect on December 9, 2022, and is based on NFPA 1, 2021 edition, with Massachusetts amendments.
ADU guidance: Protected Use ADUs still need a building permit (opens in a new tab)
EOHLC's Accessory Dwelling Unit FAQs, updated Oct 14, 2026, state that all construction of Protected Use ADUs must comply with local rules and codes and needs a building permit, and that a Protected Use ADU must be built in a legally permitted structure. The FAQs also state that as of February 2, 2025, zoning provisions inconsistent with the ADU Law and ADU Regulations are unenforceable.
Massachusetts Electrical Code (527 CMR 12.00) now based on the 2026 NEC (opens in a new tab)
The Board of Fire Prevention Regulations approved amendments to 527 CMR 12.00, the Massachusetts Electrical Code, based on the 2026 edition of NFPA 70, the National Electrical Code. The electrical code is effective as of April 24, 2026.
Executive Order No. 651: study of single-stair multifamily buildings (opens in a new tab)
Governor Healey issued Executive Order No. 651 on February 12, 2026, creating a Technical Advisory Group to study the conditions under which single-stair multifamily residential buildings should be permitted in Massachusetts. The order states that current Massachusetts building code requirements generally require two means of egress for multifamily residential buildings above three stories. The group is charged with recommending updates to 780 CMR, including proposed height and unit limits, and must submit a final report not later than 12 months from the effective date of the order. The order itself does not change the building code.
10th edition of the Massachusetts State Building Code (780 CMR) is in effect (opens in a new tab)
The tenth edition of 780 CMR first took effect on October 11, 2024. A concurrency period, later extended, ended June 30, 2025, after which the tenth edition is the only building code in effect. It is based on modified versions of the 2021 International Codes, including the IBC and IRC; chapter 51 is the Massachusetts Residential Code. The tenth edition is the base energy code; stretch and specialized codes adopted by DOER may also apply, depending on the municipality.
Current Stretch and Specialized Energy Codes (as of February 14, 2025) (opens in a new tab)
DOER posts the latest version of the Stretch and Specialized Codes as of February 14, 2025. The Stretch Code is 225 CMR 22.00 (residential) and 225 CMR 23.00 (commercial); the Specialized Code adds Appendix RC (residential) and Appendix CC (commercial) to those chapters. The Base Energy Code remains IECC 2021 with Massachusetts amendments in the 10th edition of 780 CMR.
Uniform State Plumbing Code (248 CMR 10.00) (opens in a new tab)
248 CMR 10 governs the requirements for the installation, alteration, removal, replacement, repair, or construction of all plumbing.
105 CMR 410.000 establishes minimum standards for housing to protect the health, safety, and well-being of occupants and the general public; provides enforcement procedures for boards of health; and facilitates the use of legal remedies available to occupants of substandard housing.
Lead poisoning prevention and control (105 CMR 460.00) (opens in a new tab)
105 CMR 460.000 interprets and implements M.G.L. c. 111, sections 189A through 199B, which establish a statewide program for the prevention and control of lead poisoning.
Architectural Access Board regulations (521 CMR), 2006 edition, remain in force (opens in a new tab)
521 CMR is the specialized building code regarding access for persons with disabilities for buildings in the Commonwealth. The Architectural Access Board states that the 2006 edition of 521 CMR is the edition that is currently in force.
Lead paint and compliance
Lead-paint deleading rules and CLPPP resources, smoke and carbon monoxide certificates required at sale or transfer, and Chapter 21E / Massachusetts Contingency Plan updates. Figures are official statewide aggregates only; no property names, addresses or other personal information.
10 items
MassDEP draft Risk Characterization Guidance, Chapters 11–13 (opens in a new tab)
On May 18, 2026, MassDEP issued draft Guidance for Disposal Site Risk Characterization, Chapters 11, 12 and 13, for public review, after which it intends to consider comments and issue final guidance. Written comments were requested by close of business on September 15, 2026. This is draft guidance, not an amendment of 310 CMR 40.0000.
MassGIS tier-classified Chapter 21E sites (data through August 26, 2025) (opens in a new tab)
MassGIS publishes a statewide point dataset of oil and/or hazardous material disposal sites that have been reported and Tier Classified under M.G.L. c. 21E and the MCP. The official page says the current shapefile is up to date through August 26, 2025 (uploaded August 28, 2025). The mapped sites are only a subset of reported Chapter 21E sites: sites that have not yet been Tier Classified, and sites for which a Response Action Outcome has been submitted, are not in this layer. Locations are approximate and have not been field-verified. This hub does not republish site names or addresses.
CLPPP 2024 Annual Childhood Lead Poisoning Surveillance Report (opens in a new tab)
CLPPP posts annual screening and blood lead level reports and high-risk community lists. The latest report listed on the official page is the 2024 Annual Childhood Lead Poisoning Surveillance Report. The reports include community-level screening and blood lead level prevalence data and the annual high-risk community list. Statewide counts of Letters of Full Compliance or Letters of Interim Control are not published on this page.
Massachusetts Contingency Plan (310 CMR 40.0000) — current 2024 edition (opens in a new tab)
The official MassDEP regulation page for 310 CMR 40.0000, the Massachusetts Contingency Plan, lists the current (2024) MCP as effective March 1, 2024. The MCP is the set of rules under M.G.L. c. 21E for notification, assessment and cleanup of oil and hazardous material releases.
Boston smoke and CO inspection fees (posted official schedule) (opens in a new tab)
The City of Boston still posts a Fire Prevention Fee Schedule effective September 22, 2016, as the current official schedule on its Fire Prevention fees page. For smoke and carbon monoxide detection system inspections and reinspections under M.G.L. c. 148, §§ 26F and 26F½, that schedule lists $50 for a single-family dwelling or single dwelling unit; $100 for a two-family dwelling; $150 for 6 or fewer residential units; $500 for more than 6 residential units. No later citywide fee change was verified on this run.
Smoke and carbon monoxide certificate required at sale or transfer (opens in a new tab)
The Department of Fire Services says that when you sell or transfer a home you must have a certificate of compliance from the local fire department showing that smoke and carbon monoxide alarms meet the required standards. Call the local fire department to schedule the inspection as soon as you have a closing date. Battery-powered smoke alarms that are more than 10 years old, or have expired, must be replaced with alarms that have 10-year, sealed, non-rechargeable, non-replaceable batteries, are photoelectric, and have a hush feature. The local fire department charges a fee for the inspection and certificate; fees are set by each city or town.
Massachusetts Lead Law deleading requirements (105 CMR 460) (opens in a new tab)
The Massachusetts Lead Law requires the removal or covering of lead paint hazards in homes built before 1978 where any children under 6 live. Owners, including rental property owners, must first hire a licensed lead inspector; deleading work must be done by a trained and licensed person; and a licensed lead inspector will reinspect and, if the work passes, issue a letter of full deleading compliance. Owners may use Interim Control for urgent hazards: after a licensed risk assessor approves the work, a Letter of Interim Control is issued, and the owner then has up to 2 years to remove lead hazards and receive a Letter of Full Compliance. An owner cannot evict or refuse to rent because of lead paint, and cannot avoid liability by asking tenants to sign an agreement accepting the presence of lead paint.
Lead Safe Homes: official lookup for Letters of Compliance (opens in a new tab)
CLPPP records the lead history of homes and daycares built before 1978. The public can look up a property's lead history and some inspectional documents, including reports and Letters of Compliance, through Lead Safe Homes. Lead Safe Homes 2.0 has lead inspection reports and compliance documents; Lead Safe Homes 1.0 lists a property's lead history but does not have copies of documents. This hub does not republish property-level records.
Chapter 21E reportable releases: official statewide aggregate (opens in a new tab)
MassDEP states that there have been over 40,000 releases of oil or hazardous material reported to the department since the mid-1980s. Information about these sites, including where a site is in the assessment and cleanup process and documents submitted to the department, is available through the Waste Site / Reportable Release Lookup. This hub shows only that official aggregate; it does not list individual sites, addresses or names.
Boston Fire Department smoke and CO inspection rules at sale (opens in a new tab)
The Boston Fire Department says most residential property owners need a smoke and carbon monoxide alarm inspection before they can sell their property. Apply as soon as you sign the purchase and sale agreement; the department requires a minimum of 10 business days' advance notice, not including weekends or holidays, and payment is due before an appointment is scheduled. There is no guarantee that the inspection will be scheduled before the closing date. Boston states that M.G.L. c. 148, § 26F requires sellers of residential properties built prior to 1975 with 1–5 dwelling units to obtain a Certificate of Compliance for smoke detectors upon sale or transfer, and that properties built after January 1, 1975 with 6 or more dwelling units are exempt from 26F and are not inspected by BFD for smoke compliance. M.G.L. c. 148, § 26F½ requires sellers of residential dwelling units, regardless of the year of construction or number of units, to obtain a Certificate of Compliance for carbon monoxide detectors.
Federal
Federal Register actions and determinations from HUD, USDA, EPA and DOE that affect inspection standards, lead-dust rules, and energy codes for new construction.
DOE determined that the 2024 International Energy Conservation Code would improve energy efficiency in residential buildings, with estimated national site energy savings of 7.80 percent, source energy savings of 6.80 percent, and energy cost savings of approximately 6.60 percent compared with the 2021 IECC. Under the Energy Conservation and Production Act, each State must review the energy efficiency provisions of its residential building code after an affirmative determination. Certification statements provided by States shall be submitted by December 30, 2026.
HUD and USDA announced the immediate rescission, effective May 1, 2026, of their April 26, 2024 Final Determination adopting the 2021 IECC and ASHRAE 90.1-2019 as minimum energy standards for certain newly constructed HUD- and USDA-financed housing. The notice states that a federal court vacated that determination on March 5, 2026, and that each of the departments' covered programs shall comply with the energy efficiency standards that were in effect immediately prior to publication of the Final Determination.
HUD published implementation guidance and inspection standards applying NSPIRE to the HOME Investment Partnerships and Housing Trust Fund programs. The notice aligns and extends the compliance dates of the NSPIRE final rule and the updated property standards and inspection requirements in the 2025 HOME final rule for HOME jurisdictions and participants, and extends the NSPIRE compliance date for Housing Trust Fund grantees, until April 14, 2027. For activities with written agreements executed before the compliance date, participating jurisdictions and grantees may continue to comply with the previous standards in 24 CFR parts 92 and 93.
EPA finalized a rule, effective January 13, 2025, lowering dust-lead hazard standards to any reportable level as analyzed by a laboratory recognized by EPA's National Lead Laboratory Accreditation Program, and lowering post-abatement dust-lead clearance levels to 5 µg/ft² for floors, 40 µg/ft² for window sills, and 100 µg/ft² for window troughs. The rule states that EPA's lead-based paint regulations do not compel property owners or occupants to evaluate their property for lead-based paint hazards or to take control actions, but if a lead-based paint activity such as an abatement is performed, then EPA's regulations set requirements for doing so.
DOE determined that ANSI/ASHRAE/IES Standard 90.1-2022 would improve energy efficiency in commercial buildings, with estimated national average site energy savings of 9.8 percent of commercial building energy consumption compared with the 2019 edition. Under the Energy Conservation and Production Act, each State is required to review the energy-efficiency provisions of its commercial building code and, as necessary, update its codes to meet or exceed Standard 90.1-2022. Certification statements provided by States were to be submitted by March 6, 2026.
Code news
Recent headlines on Massachusetts building and energy codes, drawn from Google News RSS and official Mass.gov announcements.
Massachusetts Delivers 550 ADU Feasibility Studies - Wisevoter (opens in a new tab)
Wisevoter · Nov 19, 2026
Fall River Herald News · Oct 22, 2026
The Cool Down · Oct 21, 2026
ADU Nihilism - Reason Magazine (opens in a new tab)
Reason Magazine · Oct 20, 2026
WCVB · Oct 15, 2026
Mass.gov · Oct 15, 2026
The Provincetown Independent · Oct 7, 2026
WWLP · Sep 2, 2026
For information only. Confirm requirements with your building official. Dates are as stated by each source.